Anthology of King of Prussia · A&D Partner: Perkins Eastman
FFE for Amenity Spaces
Creating a Sense of Home
Living Revolution plans, procures, and installs the furniture, fixtures, and equipment behind the spaces people actually choose to use. We protect the design intent, the budget, and the opening date, together.
- Installed Cost
- Availability
- Site Readiness
Stay Close To The Work
Follow Our Work
We post the amenity spaces we furnish, what it takes to get them open, and what we learn along the way. No pitch and no sequence.
Follow on LinkedInPrefer it by email?
Working on something now? Email our team directly
Anthology of Boynton Beach · BKV Group
Before the Handoff
Approved Is Not The Same as Installed
An amenity space can be beautifully designed and still open late, exceed budget, or arrive with quiet compromises. The difference is usually made in the decisions that connect specification to installation.
Approved on Paper
- Product and finish selections
- Preliminary budget
- Target opening date
Ready for the Floor
- Complete installed cost
- Verified availability
- Controlled alternates
- Coordinated delivery conditions
Validate both while the options are still open.
Viva Bene St. Peters
Four Checkpoints
Nothing Left to Chance
This is the discipline we bring to every amenity project, and the same discipline we share with A&D teams before the design and budget are locked.
465 North Park · Solomon Cordwell Buenz
Is the budget based on complete installed cost?
Product price is only the starting point. Freight, receiving, storage, delivery conditions, installation labor, site access, and coordination all move the real total.
- Product, freight, and delivery costs are included
- Receiving and storage responsibilities are defined
- Installation assumptions reflect actual site conditions
- A realistic allowance exists for approved changes
Early cost visibility creates options. Late cost discovery forces tradeoffs.
Royal Oaks, Inspirata Pointe · Perkins Eastman
Do lead times work with the project schedule?
A quoted lead time is not a coordinated installation date. Approvals, production, transit, receiving, site readiness, and installation sequencing all have to connect.
- Dates reflect current manufacturer information
- Long lead items are identified early
- Decision and approval deadlines are clear
- Delivery is tied to actual site readiness
Availability is a design input, not a post design surprise.
John Knox Village · Perkins Eastman
Is there a clear plan for substitutions?
Availability can change. The greater risk is allowing replacements without agreed criteria, approval ownership, or documentation.
- Critical performance and finish requirements are defined
- Acceptable alternate paths are identified early
- Approval authority is clear
- Final changes are documented before release
A controlled alternate preserves the design logic, not merely the product category.
Anthology of King of Prussia · Perkins Eastman
Has installation been planned around the actual site?
FFE can arrive exactly on time and still create disruption if access, staging, elevators, active construction, inspections, occupancy, or trade sequencing are not ready.
- Site readiness requirements are established
- Access, staging, and delivery windows are confirmed
- Installation is coordinated with construction and operations
- Punch list and closeout responsibilities are defined
On time delivery matters only if the site is ready to receive it.
What We Do
Environments That Thrive
We work alongside architects, designers, owners, and construction teams to deliver creative, cost effective solutions that bring the vision to life, on time.
Planning and Consultation
Expert support through design, including timeline management, budget planning, and product sourcing.
Design Support
We source products that match your aesthetic goals, and offer cost effective alternatives that hold quality.
Procurement
A seamless procurement process, because it is vital to the success of the project.
Order Processing
Structured review, order entry, and lead time management built on 20 years of coordination.
Receipt and Warehousing
Orders tracked closely so everything is correct on arrival, with storage if construction slips.
Install and Evaluation
We oversee installation, then follow up so every piece meets the design and functional intent.
Design intent survives the handoff when alignment begins before it.
Follow Living RevolutionOur Specialty
Where Life Actually Happens
Roughly 80 percent of our projects are amenity spaces. That concentration is the reason we can move quickly on cost, availability, and installation detail in the rooms where the experience is actually decided.
- The decision is emotional. Lobbies, dining, bistros, salons, and lounges are what people remember from a tour.
- The budget concentrates here. Amenity FFE carries outsized cost and outsized scrutiny.
- Durability is daily. These rooms take constant use, so performance and cleanability matter as much as finish.
- A sense of home is physical. Scale, comfort, light, and material are how belonging gets built.
Anthology of Tuckahoe · BKV Group
A room works when somebody chooses to stay in it.
John Knox Village · A&D Partner: Perkins Eastman
Markets We Serve
Environments for Life
Your Market
Senior Living
Independent living through memory care. Spaces that support dignity, wellbeing, occupancy, and the staff who work in them every day.
Your Market
Multifamily
Clubrooms, coworking, fitness, and rooftops that carry the tour, support lease up, and hold up through renewal after renewal.
Your Market
Healthcare
Environments built for clinical reality and human comfort at once, where cleanability and durability are non negotiable.
Your Market
Hospitality
The crossover that raises the bar everywhere else, and the reason our senior living and multifamily work reads the way it does.
Portfolio
Proof in the Room
Creating a sense of home.
Tell Us What You Are Planning
Bring us a concept, a budget question, a schedule that is getting tight, or a set of selections you want pressure tested. Earlier is better, and the first conversation costs nothing.
What Happens Next
- Within one business day, someone from our team replies. A person, not a sequence.
- A short conversation about the spaces, the schedule, and the budget you are working against.
- Useful input either way. If we are not the right fit, we will say so and point you somewhere better.